Line Clearance - Annexure (Checklist and Lable)


Annexure-I      : Line Clearance Checklist for Manufacturing, Compression / Filling and Coating
             Stage

MANUFACTURING:

Tablet

                                                Capsule


Sr. No.
Checks
Checked By Production
(make ‘√’ mark)
Verified By
QA
(make ‘√’ mark)
1.
Check the House keeping general cleanliness of the area.


2.
Ensure the equipment and utensils are clean, verify it visually.


3.
Ensure the absence of any other materials of the previous products in the area.


4.
Check the temperature & relative humidity of the area.


5.
Check the differential pressure of the area.


6.
Check the functioning and cleaning of return raiser.


7.
Ensure the status label on the equipment.


8.
Check the presence of related Batch Process Record (BPR) issued by QA.


9.
Released status of issued materials.


10.
Check the log card for up dated up to entry of Last activity.


11.
Check the filled line clearance label for the correct product details


                                                                Sign & Date :




Compression:                                                                                                              Filling :
Tablet

                                                           Capsule

Sr. No.
Checks
Checked By Production
(make ‘√’ mark)
Verified By
QA
(make ‘√’ mark)

1.
Check the House keeping general cleanliness of the area.



2.
Ensure the equipment and utensils are clean, verify it visually.



3.
Ensure the absence of any other materials of the previous products in the area.



4.
Check the temperature & relative humidity of the area.



5.
Check the differential pressure of the area.



6.
Check the functioning and cleaning of return raiser.



7.
Ensure the status label on the equipment.



8.
Check the calibration status of related IPQC equipment.



9.
Check the presence of related Batch Process Record (BPR) issued by QA.



10.
Release Status of product bulk batch.



11.
Check the log card for up dated up to entry of Last activity.



12.
Check the filled line clearance label for the correct product details



                                                                     Sign & Date :




Tablet Coating :
Sr. No.
Checks
Checked By Production
(make ‘√’ mark)
Verified By
QA
(make ‘√’ mark)
1.
Check the House keeping general cleanliness of the area.


2.
Ensure the equipment and utensils are clean, verify it visually.


3.
Ensure the absence of any other materials of the previous products in the area.


4.
Check the temperature & relative humidity of the area.


5.
Check the differential pressure of the area.


6.
Check the functioning and cleaning of return raiser.


7.
Ensure the status label on the equipment.


8.
Check the presence of related Batch Process Record (BPR) issued by QA.


9.
Released status of the product batch.


10.
Check the log card for up dated up to entry of Last activity.


11.
Check the filled line clearance label for the correct product details.


                                                                     Sign & Date :





Packing :
Tablet

                                                          Capsule

Sr. No.
Checks
Checked By Production
(make ‘√’ mark)
Verified By
QA
(make ‘√’ mark)
1.
Check the House Keeping & general cleanliness of the area.


2.
Ensure the equipment and utensils are clean, verify it  visually


3.
Ensure the absence of any other materials of the previous product in the area.


4.
Check the correctness of the product and packing materials of the product undertaken with respect to the identification and strength.


5.
Check the conveyor belt and surrounding area clean and free from any previous product and it’s any material.


6.
Check the presence of related Batch packing Record (BPR) issued by QA & Released status of issued materials.


7.
Confirm the released status label of the product.


8.
Ensure the status label at the packing line.


9.
Check the filled line clearance label for the correct product details.


10.
Check the log card for up dated up to entry of Last activity.


                                                                     Sign & Date :




Annexure-II    : Line Clearance Label
COMPANY NAME
MACHINE / AREA / LINE CLEARANCE
Equipment / Area Name
:

ID No.
:

Product Name
:

B. No.
:

Date
:

Stage
:

Previous Product
:

B. No.
:

Done By
:

Date
:

Checked By (Production)
:

Date
:

Checked By (QA)
:
                      Ref. SOP No.: SOP-QAD-015


Annexure-III   : Line Clearance Checklist for Dispensing
Dispensing Area (Ware-house) :
Sr. No.
Checks
Checked By Production
(make ‘√’ mark)
Verified By
QA
(make ‘√’ mark)
1.
Check the House keeping general cleanliness of the area.


2.
Ensure the equipment and utensils are clean, verify it visually.


3.
Ensure the absence of any other materials of the previous products in the area.


4.
Check the temperature & relative humidity of the area.


5.
Check the differential pressure of the area.


6.
Check the functioning and cleaning of return raiser.


7.
Ensure the status label on the equipment.


                                                                     Sign & Date :






4 comments:

  1. Dear sir have a nice day. Can you explain Who is sign in "done by" line clerance label in (Annexure-II : Line Clearance Label)

    ReplyDelete
  2. Dear sir have a nice day.can you reply with evidance(ACCORDING GUIDE) must be make line clearance (before &After ) every batch ?

    ReplyDelete
  3. This comment has been removed by the author.

    ReplyDelete